Back to work

I have a week until my next trip so I’m set to get back to work. I’ve made good progress on another knitted baby afghan while I was away but didn’t work on my Cathedral Windows at all. I need to iron some more of the muslin squares and I’ll take both the knitting and the Cathedral Windows with me when I go to Boston next week.

Today I plan on loading Adam’s quilt on the longarm and to start piecing on another UFO. I’m just not sure which UFO I’m going to work on next so I’ll load Adam’s jean quilt first.

0
  

2 Responses to “Back to work”

Leave a Reply

What is 12 + 11 ?
Please leave these two fields as-is:
IMPORTANT! To be able to proceed, you need to solve the following simple math (so we know that you are a human) :-)
Blog Rings