Sunday progress report

This was a good week!

  • I quilted 2 Heartstrings donated tops and finished the binding on one – the other is ready to bind.
  • I pieced two backings from stash for tops waiting for quilting.
  • I pieced my RWB rails from stash – the top is almost assembled.
  • I have one of my Quick Strippie Quilts loaded and ready to quilt with a backing from stash.
  • I purchased NO fabric this week.
  • Oops I forgot I ordered fabric from Pam at Real Women Quilt which arrived today (Monday) 3 different fabrics 2 yards each. Pam’s having an Inventory Reduction sale so check it out – not that I’m encouraging you all to buy fabric!

Keith will be gone from for a week and a half except for Wednesday night so I’ll have lots of time to work but then I have a trip to Florida coming up the last week of June and a trip to Virginia the first week of July so I need to get a lot done.


Email me

6 comments

Leave a Reply