Check!

Three things on my to do list today and all 3 checked off!

  • Finish twisting the pinwheel blocks
  • Piece a back and load the green tumbler quilt on the longarm
  • Make the binding for the 2nd Strips and Strings Log Cabin quilt and machine stitch it on. (I might even hand stitch it down tonight)

I had planned to take these blocks back to GA to assemble but I might just sew them together here in between quilting sessions.

12 comments

  1. That turned out really cute!! You must work nonstop during the day. I have too many distractions and pets, including a puppy.

  2. What a fun, happy quilt, Mary! And you look like you had fun putting it together. Someone will absolutely love getting this quilt.

Leave a Reply